Shenzhen Sinexcel Electric error codes
Shenzhen Sinexcel Electric inverter error code AC Bus Reverse Phase
WattMate is not affiliated with Shenzhen Sinexcel Electric. This page summarises Shenzhen Sinexcel Electric's own published documentation; your installer and Shenzhen Sinexcel Electric are the authority on your system. WattMate doesn't repair systems or make site visits.
What it means
- Meaning
- The phases in the AC connection are incorrectly configured.
- Likely cause
- Reverse phase of AC bus connection
- What the manual says to do
- Reconfigure the AC connections properly and consult an electrician.
- Manufacturer's severity
- Critical
Shenzhen Sinexcel Electric's documentation says this one needs your installer.
Extracted from Shenzhen Sinexcel Electric's published manual. Check it against the manual for your model. Open the source document
When to call your installer or the warranty line
Your installer is your first warranty contact. If they've gone, the manufacturer's warranty line still covers the hardware. Don't open the inverter or battery case yourself: work inside it is for a licensed electrician.
If you see smoke, scorch marks or smell burning, switch the system off at the AC and PV isolators and call your installer. If anyone is in danger, call 000.
We don't have a warranty line on file for Shenzhen Sinexcel Electric yet. See the manufacturer contacts we do hold, or ask your installer.