Ningbo Sunways Technologies error codes
Ningbo Sunways Technologies inverter error code Meter Comm Fault
WattMate is not affiliated with Ningbo Sunways Technologies. This page summarises Ningbo Sunways Technologies's own published documentation; your installer and Ningbo Sunways Technologies are the authority on your system. WattMate doesn't repair systems or make site visits.
What it means
- Meaning
- Meter communication fault
- Likely cause
- Issues with meter or meter wiring.
- What the manual says to do
- Verify meter connections; check meter for faults.
- Manufacturer's severity
- Warning
Extracted from Ningbo Sunways Technologies's published manual. Check it against the manual for your model. Open the source document
When to call your installer or the warranty line
Your installer is your first warranty contact. If they've gone, the manufacturer's warranty line still covers the hardware. Don't open the inverter or battery case yourself: work inside it is for a licensed electrician.
If you see smoke, scorch marks or smell burning, switch the system off at the AC and PV isolators and call your installer. If anyone is in danger, call 000.
We don't have a warranty line on file for Ningbo Sunways Technologies yet. See the manufacturer contacts we do hold, or ask your installer.